Auzstar Homes Logo
Services/Demolition & Construction

Knockdown Rebuild

Dismantle your existing home and replace it with a contemporary custom residence without changing the street address you love.

Clear Specifications

Project Scope Overview

We believe in complete transparency. Here is a detailed breakdown of what is included and excluded in our Knockdown Rebuild package.

What's Included

  • Asbestos inspection and safe removal oversight
  • Demolition permits & coordination with local operators
  • Utility disconnections and site clearing safety checks
  • Custom footing designs matching the cleared block profile
  • Brand-new drainage system and underground re-plumbing
  • Full custom framing and modern architectural build
  • Victorian Building Authority occupancy certification

What's Excluded

  • Demolition surveyor application fees
  • Power/gas reconnection fees from utility distributors
  • Council asset protection bond payments
Step-By-Step Method

Custom Construction Timeline

Estimated duration: 28 - 40 Weeks
Phase 1

Asbestos & Demolition

Safely removing hazardous materials and dismantling the old structure under VBA regulations.

1
Phase 2

Site Prep & Drainage

Clearing site roots, leveling, running new underground utility pipelines, and pouring the slab.

2
Phase 3

Structure Build

Constructing timber/steel frames, installing roofing sheets, cladding, and double-glazed glazing.

3
Phase 4

Fit-Out & Final Walkthrough

Tiling, joinery installation, appliance fit-offs, VBA occupancy sign-off, and handover.

4
Visual Portfolio

Project Showcases

Modern Front Door Entry
IMAGE // 01

Modern Front Door Entry

Contemporary Kitchen Layout
IMAGE // 02

Contemporary Kitchen Layout

Spacious Kitchen Design
IMAGE // 03

Spacious Kitchen Design

Kitchen Renovation Ideas
IMAGE // 04

Kitchen Renovation Ideas

Sleek Bathroom Rebuild
IMAGE // 05

Sleek Bathroom Rebuild

Common Inquiries

Frequently Asked Questions

On a square-meter basis, yes. It avoids structural surprises of old buildings and delivers a fully energy-efficient home.
Yes, we handle the entire demolition phase, including permits, asbestos removal, and site clearing.
Yes, you will need to relocate for approximately 8 to 10 months during demolition and construction.
We coordinate disconnections before demolition and run new connections for the new home.
Yes, we can specify retaining walls or setbacks to protect established trees and features.
We conduct detailed soil profiling and site surveys to engineer the slab foundations correctly.
Yes, we analyze local council overlays (e.g. vegetation, heritage) and design compliant plans.
Absolutely. We hire certified specialists to safely remove and dispose of all asbestos materials.
Start Your Journey

Ready to construct your
Knockdown Rebuild plan?

Our VBA registered builders are ready to coordinate soil profile details, custom layouts, and Victoria building permit approvals.

Chat on WhatsApp